To the central content area

2004 Queiren Heliport Noise Control Zone Planning Project

Absrtact
Contract regulation of the basis '2004 The Queiren Heliport Noise Control Zone Planning Project.' (hereafter referred to this project ), this project every work carries out the achievement summary as follows: This project group according to the goal of the project and demand for the working project, carrying on the execution of every work, the groundwork content has six items to include: (1) The aviation noise of the Queiren Heliport influences and analyses,(2) airport noise temporary monitoring, (3) the Queiren Heliport noise control zone planning, (4) the Queiren Heliport monitoring system check, (5) noise instrument Calibration, and (6) indoor aviation noise verify ,etc., such projects as the homework. This project since November of 2004 till January 25 , 2005, had already carried out and expired, had directed against the execution of every work, have all already finished and had concrete achievements. During this project period had already summary the Queiren Heliport monitoring seasonal report, which form 2004Q3 to 2005Q4. And analyze the every season’s aviation noise effect such as it is noise per monitoring station for variation tendency, flight information change, the noise contour moving ,etc.. The heliport aviation noise coverage , limited to Queiren Heliport in the Queiren township Liu-jia village in it only still at present . And finish the surrounding area of the airport 24 temporary monitoring of aviation noise, this time monitoring when it finish already among the works, through compared with flight information to behind monitor by result, the monitoring result of every monitoring point has not been all up to the standard of defending the making area of the first aviation noise yet. Additional, cooperate with the Environmental Protection Agency to carry out of one set traffic noise monitoring examine work. During the work item for planning heliport control zone, the project group have draw up the draft plan according to the seasonal report by heliport and reference to the temporary monitoring data. And also handled the 3 times convocation meeting to the Environmental Protection Agency at Queiren Administration Office. And help the Bureau of Environment Protection Tainan Country finishing the announcement homework formally on March 7 , 2005 publicly ,The first edition for Queiren Heliport noise control zoning planning range for Queiren Heliport at the Queiren township Liu-jia village was included in the first grade, the Queiren Heliport was included in the second grade area. In other working projects , this project carries on the airport 3 times for airport noise monitoring system checking, finish 4 instrument’s calibration work, and propose draft procedure and quantity on ' indoor aviation noise verify procedure ' not to examine the method for Environmental Protection Agency's reference to assay to correct to count, carrying out the achievement and all carrying on intact in the report to several proves.
Keyword
Heliport , noise, control zone
Open
top